86 0371-5508-3768
					[email protected]
					
				
				
			Henan Xinchang Import and Export Trading Co.,Ltd
With the total length of 140KM Chengya Railway construction finished, the good working on kinds of power cable installation got a high appraisal, now let us take a look from the nice and comfortable photo on cable installation.
Congratulations to all in the whole construction project.



COPYRIGHT © 2017 Henan Province Xinchang Copper Co.,Ltd.